EDILSON MELLO BIM PROJECTS · ENGINEERING
PT EN
Request a proposal
Technical notes

Notes on design, standards and coordination.

How to structure a BEP the site actually uses

The fields that define responsibility and acceptance criteria, and the ones that just fill pages.

From model to spreadsheet: parameters that keep traceability

A shared-parameter structure so the budget follows the model revision.

ISO 19650 in practice for small practices

The minimum viable process to meet the standard without stalling production.

Electrical routes in technical ceilings: tolerances that avoid rework

Clearance criteria between cable trays, ducts and structure in the clash matrix.

Have a project to model or coordinate?

Send the files you have and the intended LOD. We reply with schedule and price within two business days.

Request a proposal