Precision you can see before construction.
BIM projects for contractors and architecture practices. Federated models, clashes resolved at design stage and quantities taken straight from the model.
Four fronts, one single model
Engaged by fixed scope or by dedicated team allocation.
Scope details →Architecture, structure and MEP in a single versioned model, with standardised naming parameters.
Clash detection rounds with a traceable report by discipline, owner and resolution status.
Material take-off tied to the model and the schedule, with auditable calculation records.
BEP and common data environment (CDE) rollout, with a documented approval workflow.
Recent projects
Four stages, each with a closed deliverable
No stage moves forward without approval recorded in the common data environment.
Masses, areas and constructability checks.
Federated disciplines and the first clash detection round.
Fabrication, assembly and link to the schedule (4D).
Model as built, ready for facilities management.

